Start Up Support Supervisor CPF job at TotalEnergies
New
Today
Linkedid Twitter Share on facebook
Start Up Support Supervisor CPF
2026-02-09T07:32:41+00:00
TotalEnergies
https://cdn.greatugandajobs.com/jsjobsdata/data/employer/comp_7464/logo/totalenergies-logo-png_seeklogo-405344.png
FULL_TIME
BULISA-INDUSTRIAL AREA(UGA)
Uganda
00256
Uganda
Petroleum
Management, Science & Engineering, Business Operations, Energy & Mining, Construction
UGX
MONTH
2026-02-23T17:00:00+00:00
8

Context & Environment

There is no equivalent project of such an industrial drilling magnitude in a remote and sensitive area within the Company today. The Tilenga oilfields are partly situated in a protected National Park, partly beneath the river Nile wetlands area, and within densely populated area in a rural and remote part of Uganda. Activities exposed to the risk of major incidents with severe potential consequences due to local environment and important presence of NGO’s. Factory Drilling with a well delivered every 4 days using 3 drilling rigs simultaneously will necessitate standardization of equipment and procedures, strict enforcement of Drilling & Well instructions, safe and efficient logistic management on site. The project is focused on delivering the lowest possible cost, which requires challenging TotalEnergies design concepts as well as substantially challenging the TotalEnergies referential.

Heavy and waxy oils will be produced from 29 well pads, (with 9 located in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bwpd of water treatment capacity. Reservoir pressure maintenance is ensured either by water injection and by polymer water injection depending on the reservoir’s characteristics. The project also includes an extended interconnecting network with temperature preservation. LPG extraction, storage and tankers loading facilities are part of the CPF facilities.

Multicultural environment

Ugandan rules and regulations, administrative requirements and technical authorizations as well as international codes for onshore plant will apply. Due to staggered development on CPF, it is expected that SIMOPS (Operations vs Construction), will occur on CPF.

Activities

Main Duties and Responsibilities:

Project Phase :

  • Become site and process system familiar,
  • Review of Operating manuals submitted by Mc Dermott / Sinopec,
  • Review of Operational Tests Procedures submitted by Mc Dermott / Sinopec,
  • Review of Leak Test Procedures submitted by Mc Dermott / Sinopec,
  • Preparation of start-up sequence, marked-up PIDs,
  • Contribution to Black start procedure,
  • Familiarize with ESP initial Start Up & operating, Creation of L4 start-up and operating procedures, including pigging procedures
  • Population of the Routine Task lists,
  • Preparation of the Operator round Check lists .
  • Preparation of Shift report templates,
  • Preparation of pre-start-up check lists,
  • Coordinate with Site training coordinator for the organization of the OJT phase for new operators.

Operational Phase :

  • Acts as the Delegated Operating Authority once units / packages have been HO to Company and Company PTW applies.
  • Ensure safe working conditions for all personnel and perform last minute risk assessments, toolbox talks and site safety rounds,
  • Performs regularly daily safety rounds and ensure proper housekeeping and restore anomalies ASAP,
  • Identify downgraded situations and propose mitigating measures; then ensure that these mitigation measures are applied,
  • Contribute to the reporting of anomalies, incidents, Stop card participate to the investigations including Cause Tree Analysis and apply corrective actions as necessary,
  • Participate to the Risk Assessment
  • Participate to PTW audits,
  • Participate to the Weekly Safety meeting,
  • In case of emergency situations, ensure proper safeguarding of process facilities and follow up requests of the Production Superintendent,
  • Follow strictly the Inhibition and override Management system, ensuring CCR teams are fully in compliance,
  • Ensure correct follow up of defined mitigation measures of SIMOPS dossiers, PTW, Job Safety Analysis and DGS,
  • Opening of all deemed high risk permits on site,
  • Ensure that all mechanical and electrical isolations, flange tagging and logging, flushing, pressure test and start up programs are fully prepared and executed when required.

Candidate Profile

Qualifications & Experience:

  • Diploma of Higher Education or BTCE. Education on operational safety, production operations, well operations
  • Professional experience of minimum 10 years, and 3 years in similar position.
  • Good technical skills in Oil &Gas.
  • Knowledge of ESPs operation.
  • Conversant with DCS based process control.
  • Good knowledge of TotalEnergies HSE Safety Rules, SIMOPS, PTW System, or equivalent in Oil & Gas industry.
  • Ability to work under pressure and stressing conditions.
  • Ability to lead a team. Natural Authority.
  • Responsible, able to take decisions.
  • Adaptability and ability to work in an international environment.
  • Good communication skills. Clear and concise reporting both verbal and written.

Additional Information

TotalEnergies values diversity, promotes individual growth and offers equal opportunity careers.

  • Become site and process system familiar,
  • Review of Operating manuals submitted by Mc Dermott / Sinopec,
  • Review of Operational Tests Procedures submitted by Mc Dermott / Sinopec,
  • Review of Leak Test Procedures submitted by Mc Dermott / Sinopec,
  • Preparation of start-up sequence, marked-up PIDs,
  • Contribution to Black start procedure,
  • Familiarize with ESP initial Start Up & operating, Creation of L4 start-up and operating procedures, including pigging procedures
  • Population of the Routine Task lists,
  • Preparation of the Operator round Check lists .
  • Preparation of Shift report templates,
  • Preparation of pre-start-up check lists,
  • Coordinate with Site training coordinator for the organization of the OJT phase for new operators.
  • Acts as the Delegated Operating Authority once units / packages have been HO to Company and Company PTW applies.
  • Ensure safe working conditions for all personnel and perform last minute risk assessments, toolbox talks and site safety rounds,
  • Performs regularly daily safety rounds and ensure proper housekeeping and restore anomalies ASAP,
  • Identify downgraded situations and propose mitigating measures; then ensure that these mitigation measures are applied,
  • Contribute to the reporting of anomalies, incidents, Stop card participate to the investigations including Cause Tree Analysis and apply corrective actions as necessary,
  • Participate to the Risk Assessment
  • Participate to PTW audits,
  • Participate to the Weekly Safety meeting,
  • In case of emergency situations, ensure proper safeguarding of process facilities and follow up requests of the Production Superintendent,
  • Follow strictly the Inhibition and override Management system, ensuring CCR teams are fully in compliance,
  • Ensure correct follow up of defined mitigation measures of SIMOPS dossiers, PTW, Job Safety Analysis and DGS,
  • Opening of all deemed high risk permits on site,
  • Ensure that all mechanical and electrical isolations, flange tagging and logging, flushing, pressure test and start up programs are fully prepared and executed when required.
  • Good technical skills in Oil &Gas.
  • Knowledge of ESPs operation.
  • Conversant with DCS based process control.
  • Good knowledge of TotalEnergies HSE Safety Rules, SIMOPS, PTW System, or equivalent in Oil & Gas industry.
  • Ability to work under pressure and stressing conditions.
  • Ability to lead a team. Natural Authority.
  • Responsible, able to take decisions.
  • Adaptability and ability to work in an international environment.
  • Good communication skills. Clear and concise reporting both verbal and written.
  • Diploma of Higher Education or BTCE. Education on operational safety, production operations, well operations
associate degree
12
JOB-69898d99a8351

Vacancy title:
Start Up Support Supervisor CPF

[Type: FULL_TIME, Industry: Petroleum, Category: Management, Science & Engineering, Business Operations, Energy & Mining, Construction]

Jobs at:
TotalEnergies

Deadline of this Job:
Monday, February 23 2026

Duty Station:
BULISA-INDUSTRIAL AREA(UGA) | Uganda

Summary
Date Posted: Monday, February 9 2026, Base Salary: Not Disclosed

Similar Jobs in Uganda
Learn more about TotalEnergies
TotalEnergies jobs in Uganda

JOB DETAILS:

Context & Environment

There is no equivalent project of such an industrial drilling magnitude in a remote and sensitive area within the Company today. The Tilenga oilfields are partly situated in a protected National Park, partly beneath the river Nile wetlands area, and within densely populated area in a rural and remote part of Uganda. Activities exposed to the risk of major incidents with severe potential consequences due to local environment and important presence of NGO’s. Factory Drilling with a well delivered every 4 days using 3 drilling rigs simultaneously will necessitate standardization of equipment and procedures, strict enforcement of Drilling & Well instructions, safe and efficient logistic management on site. The project is focused on delivering the lowest possible cost, which requires challenging TotalEnergies design concepts as well as substantially challenging the TotalEnergies referential.

Heavy and waxy oils will be produced from 29 well pads, (with 9 located in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bwpd of water treatment capacity. Reservoir pressure maintenance is ensured either by water injection and by polymer water injection depending on the reservoir’s characteristics. The project also includes an extended interconnecting network with temperature preservation. LPG extraction, storage and tankers loading facilities are part of the CPF facilities.

Multicultural environment

Ugandan rules and regulations, administrative requirements and technical authorizations as well as international codes for onshore plant will apply. Due to staggered development on CPF, it is expected that SIMOPS (Operations vs Construction), will occur on CPF.

Activities

Main Duties and Responsibilities:

Project Phase :

  • Become site and process system familiar,
  • Review of Operating manuals submitted by Mc Dermott / Sinopec,
  • Review of Operational Tests Procedures submitted by Mc Dermott / Sinopec,
  • Review of Leak Test Procedures submitted by Mc Dermott / Sinopec,
  • Preparation of start-up sequence, marked-up PIDs,
  • Contribution to Black start procedure,
  • Familiarize with ESP initial Start Up & operating, Creation of L4 start-up and operating procedures, including pigging procedures
  • Population of the Routine Task lists,
  • Preparation of the Operator round Check lists .
  • Preparation of Shift report templates,
  • Preparation of pre-start-up check lists,
  • Coordinate with Site training coordinator for the organization of the OJT phase for new operators.

Operational Phase :

  • Acts as the Delegated Operating Authority once units / packages have been HO to Company and Company PTW applies.
  • Ensure safe working conditions for all personnel and perform last minute risk assessments, toolbox talks and site safety rounds,
  • Performs regularly daily safety rounds and ensure proper housekeeping and restore anomalies ASAP,
  • Identify downgraded situations and propose mitigating measures; then ensure that these mitigation measures are applied,
  • Contribute to the reporting of anomalies, incidents, Stop card participate to the investigations including Cause Tree Analysis and apply corrective actions as necessary,
  • Participate to the Risk Assessment
  • Participate to PTW audits,
  • Participate to the Weekly Safety meeting,
  • In case of emergency situations, ensure proper safeguarding of process facilities and follow up requests of the Production Superintendent,
  • Follow strictly the Inhibition and override Management system, ensuring CCR teams are fully in compliance,
  • Ensure correct follow up of defined mitigation measures of SIMOPS dossiers, PTW, Job Safety Analysis and DGS,
  • Opening of all deemed high risk permits on site,
  • Ensure that all mechanical and electrical isolations, flange tagging and logging, flushing, pressure test and start up programs are fully prepared and executed when required.

Candidate Profile

Qualifications & Experience:

  • Diploma of Higher Education or BTCE. Education on operational safety, production operations, well operations
  • Professional experience of minimum 10 years, and 3 years in similar position.
  • Good technical skills in Oil &Gas.
  • Knowledge of ESPs operation.
  • Conversant with DCS based process control.
  • Good knowledge of TotalEnergies HSE Safety Rules, SIMOPS, PTW System, or equivalent in Oil & Gas industry.
  • Ability to work under pressure and stressing conditions.
  • Ability to lead a team. Natural Authority.
  • Responsible, able to take decisions.
  • Adaptability and ability to work in an international environment.
  • Good communication skills. Clear and concise reporting both verbal and written.

Additional Information

TotalEnergies values diversity, promotes individual growth and offers equal opportunity careers.

Work Hours: 8

Experience in Months: 12

Level of Education: associate degree

Job application procedure

Application Link: Click Here to Apply Now

All Jobs | QUICK ALERT SUBSCRIPTION

Job Info
Job Category: Management jobs in Uganda
Job Type: Full-time
Deadline of this Job: Monday, February 23 2026
Duty Station: BULISA-INDUSTRIAL AREA(UGA) | Uganda
Posted: 09-02-2026
No of Jobs: 1
Start Publishing: 09-02-2026
Stop Publishing (Put date of 2030): 10-10-2076
Apply Now
Notification Board

Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.

Caution: Never Pay Money in a Recruitment Process.

Some smart scams can trick you into paying for Psychometric Tests.